Power transformers up to 400kV

Scope of Inspection and Control 

Power transformers up to 400kV

Scope of inspection and control by evaluating different inspection parameters:

  • Active resistance of windings;
  • Transformation ratio;
  • Connection group.

 

 

ACCREDITATION      Request