AC and DC motors
Scope of Inspection and Control
AC and DC motors
Scope of inspection and control by evaluating different inspection parameters:
- Active resistance of windings
The Inspection Body Type “C” was set up in the year 2000 and possesses Certificate of Accreditation, acc. BDS ЕN ISO/IEC 17020:2012 issued by the Executive Agency of the Bulgarian Accreditation Service.
The Inspection Body uses well-equipped stationary and mobile test stations. It issues Inspection Certificates for services related to: inspection and control of electrical switchgear equipment, cable line marking, localization and elimination of cable failures, test of protective dielectric equipment and materials, earth-loop impedance and resistance of grounding systems, etc.
Scope of Inspection and Control
AC and DC motors
Scope of inspection and control by evaluating different inspection parameters:
Scope of Inspection and Control
Power circuit breakers and disconnectors up to 400 kV
Scope of inspection and control by evaluating different inspection parameters:
Scope of Inspection and Control
Relay protection, electrical automation control, telemechanics and secondary circuits
Scope of inspection and control by evaluating different inspection parameters:
Scope of Inspection and Control
Current measuring transformers up to 400 kV
Scope of inspection and control by evaluating different inspection parameters:
Scope of Inspection and Control
Voltage measuring transformers up to 400 kV
Scope of inspection and control by evaluating different inspection parameters:
Scope of Inspection and Control
Fiber optic cable lines
Scope of inspection and control by evaluating different inspection parameters:
Each Client and User of the services provided by the Inspection Body, Type “C” with EL KONTROL EOOD, can file a written complaint or objection at the company’s main office. Complaints and objections are reviewed within 1 week from their submission in accordance with the Inspection Body Type “C” Management System. The complaining or objecting party receives a written reply in line with Procedure PKOK 15.01.06-2013.