El Kontrol EOOD, electrical installation and commissioning, engineering
About us
Structure
Company Policy
El kontrol Germany
Questionnaire
Activities
Engineering and Design
Design
Retrofit
Automation
Electrical Installation Works
Construction
Inspection Body
Service-Station
Machinery
Production
Electrical panels
Distribution Panels
Panels with Socket Outlets
Building Power Distribution Systems
Relay Protection Panels
Power factor regulators
Automated Control Panels
Electro-Metering Panel Boxes
Control Cabinets
Control Panels
Automatic Transfer Switch (ATS) Control Panels for Low Voltage
SIVACON S8
SWITCHGEAR
NXAIR
MV Mobile Switchgear for outdoor use
Others
Steel Structures
Laser Engraved Plates
Sales
Description
Manufacturers
ABB
SIEMENS
WAGO
IDE
ORTAC
RITTAL
RITTAL
Catalogues
Price List
WAGO
IDE
ORTAC
RITTAL
Promotions
Online Product/s Request
Projects
Reference Projects
Activity Areas
Projects Map
News
Contact Us
Default
Default
A visit to Danfoss Drives Innovate, Finland
Structure
Company Policy
El kontrol Germany
Questionnaire
Main Menu (en-GB)
Activities
Engineering and Design
Design
Retrofit
Automation
Electrical Installation Works
Construction
Inspection Body
Electrical switchgear and equipment up to and over 1000V
Electrical switchgear and equipment up to 30kV
Electrical machines and equipment up to 35kV
Electrical machines and equipment for voltage up to 1000V
Electrical protective equipment
Cables and cable lines up to 35kV
Power transformers up to 400kV
Electrical Insulating Oil up to 220kV
Direct and alternating current electric motors up to 6kV
Power circuit breakers and disconnectors for up to 400kV
Relay protection, electric automation controls, telemechanics and secondary circuits in electrical switchgears for up to and over 1000V
Current and voltage measuring transformers for up to 400kV
Fiber optic cable lines
COMPLAINTS AND OBJECTIONS
Service-Station
ABB Authorized Value Provider
SIEMENS Solution Partner
Repair Works
Prevantive Maintenance
Electronic Devices and System Installation
Operational Staff Training
Industrial Electronics Service Station major clients:
Machinery
Basket Crane Truck TATRA
Basket Crane Truck MERCEDES
Basket Crane Truck GAZ
Mobile Crane LIEBHERR
Mobile Crane MAZ
Truck VOLVO with Crane
Truck MAN with Crane
Truck MERCEDES
Dumper Truck MERCEDES
Excavator JCB Multifunctional
Mini Excavator KOMATSU
Telescopic Loader (Telehandler) MANITOU
Mini Loader BOBCAT
Forklift BALKANCAR
Forklift DIMEX
Basket Crane MERCEDES SPRINTER 313
Production
Electrical panels
Distribution Panels
Panels with Socket Outlets
Building Power Distribution Systems
Relay Protection Panels
Power factor regulators
Automated Control Panels
Electro-Metering Panel Boxes
Control Cabinets
Control Panels
Automatic Transfer Switch (ATS) Control Panels for Low Voltage
SIVACON S8
SWITCHGEAR
NXAIR
MV Mobile Switchgear for outdoor use
Others
Steel Structures
Laser Engraved Plates
Sales
Description
Manufacturers
ABB
SIEMENS
WAGO
IDE
ORTAC
RITTAL
RITTAL
Catalogues
ABB
SIEMENS
WAGO
IDE
ORTAC
RITTAL
OBO Bettermann
Price List
Price List WAGO
Price List IDE
Price List ORTAC
Promotions
Online Product/s Request
Projects
Current Projects
Reference Projects
Reconstruction of 110kV switchgear in LUKOIL Neftohim Burgas AD
Construction of new 110/20 kV Substation Kableshkovo
Reconstruction of 110 kV Switchyard in 110/20 kV S/st Lovech
Design and construction of two complete transformer stations to supply charging stations, design and construction of cable routes to charging stations
Construction of bay No. 18 in 220 kV Switchyard at Maritsa East 2 TPP
Power Supply of ID Fan in Unit 7 - Primary and Secondary Commutation
Substitution of electrical drives in 110 kV Switchyard in Maritsa East 2 TPP
Erection, installation and commissioning of main equipment in Flue Gas Desulphurization Plant (FGD) and Gypsum Dewatering Plant at Maritsa East 2 TPP
Erection of 20/6/0,4 kV Movable Substation "Staroselec"
Reconstruction and enlargement of 400 kV Switchyard in Maritsa East 3 TPP, as part of a 400 kV Power Distribution Line from Maritsa East 3 TPP to substation Alibeykjoy (Turkey)
Complete engineering of Lighting and Socket Installation in Gypsum Dewatering Plant at the FGD Plant in Maritsa East 2 TPP
Reconstruction and commissioning of 10 kV Indoor Switchgear in 110/10 kV Substation Zora in Stara Zagora
Rehabilitation of Power Unit 2 of Maritsa East 3 TPP
Rehabilitation of 220 kV Switchyard at Maritsa East 3 TPP - second stage: substitution of disconnectors and circuit breakers
Substitution of 20 kV circuit breaker for main pump in Oil-supply Farm Stara Zagora
Integration of 110/20 kV Substation Proslav to the Bulgarian Electrical System – 2nd stage, installation works
Construction of cable trays and laying of power cables for power supply of FGD Plant for Units 1, 2, 3 and 4 in Maritsa East 3 TPP
Dismantle works in 400 kV Outdoor Switchgear of 400/220/110/31,5 kV Substation Plovdiv – South, First and Second Stage
Rehabilitation of 400 kV Switchyard in Maritsa East II TPP
Reconstruction of 400/220/110/31,5 kV Substation "Plovdiv-South" - Reconstruction and Enlargement of Switchyard 400 kV
Complete engineering for substitution of electrical equipment in 0,4 kV Indoor Switchgears, in Unit 1, Unit 2, Unit 3 and Unit 4 of Maritsa East 2 TPP
Rehabilitation of Maritsa East III - Unit 1
Design, erection and putting into operation of 110/20 kV Substation Byala
Construction of commercial measuring of the electrical energy in Kaproni Plc., Kazanlak
Substation Parvomay - repair of 1-st section of the 110 kV Switchyard
220/110 kV Substation Aleko, Pazardzhik - Rehabilitation of 220 kV Outdoor Switchgear
Construction of Main Pipe Belt Conveyor №2 - Maritsa East 2 TPP
Maritsa East 3 TPP - Rehabilitation of Unit 4
Delivery of electrical materials and electrical works in Maritsa East 1 TPPAES Maritsa East 1 EOOD
Commissioning works in Water-Filtering Station in Dimitrovgrad
Electrical works in Oil-Supply Farms Ihtiman, Iliyantsi and Vetren
Delivery and retrofit of 6kv Circuit Breakers (CBs), design of project for installation of CBs and installation of two CBs
Supply and installtion of lighting system in Buffer pond area at Enel Maritsa East 3 Power Plant
Manufacturing of electrical panel for control of technological process
Substation Parvomai - repair of 2-nd section of the 110 kV Switchyard
Delivery of electrical equipment, design and installation works related to integration of Fire Fighting System to Fuel Oil Plant and Coal Handling Plant of Enel Maritsa East 3 TPP
Rehabilitation of Units 3 and 4 in Maritsa East 3 TPP - Electrical works
Electrical installation of Stacker / Reclaimer, as part of the Coal and Limestone Handling System at Maritsa East 1 TPP
Design, installation and commissioning of C&I and electrical equipment in Coal Handling Plant, Enel Maritsa East 3 TPP
Maritsa East Substation, Galabovo - erection of 400 kV and 31,5 kV Switchgears, 630 MVA Autotransformer 400/220/31,5 kV; Reconstruction and extension of 220 kV Switchgear
Electrical Installation of Electrostatic Precipitators (ESP) - units 1 and 2 in Maritsa East 1 TPP
Construction of 110/20 kV Substation Suvorovo, part of the Project for erection of Wind Farm Suvorovo
Rehabilitation of 400/110/31.5/20 kV Substation Burgas
Erection of 110/20 kV Substation Helios
Disassembly, design, installation and commissioning of electrical and C & I equipment in Coal Handling Plant at Enel Maritsa East 3 TPP
Reconstruction of 110/6.3 kV Substation No. 2B
110/20/6 kV Substation No.7 – Reconstruction of 110 kV Switchyard; Reconstruction of 110 kV Terminal Baikal and 110 kV Terminal Detelina /Sotirov/
Electrical works for construction of Photovoltaic Park Letnitsa
Construction and electrical works for erection of Photovoltaic Park Dushantsi
Construction works in Troyanovo-3 Mine, Subproject: 110/20/6 kV Substation Iztochna
Reconstruction of the 110 kV Switchyard on Substation Slaveykov
Repair of concrete foundations in 400 kV Substation Burgas
110/20 kV Substation Aytos– reconstruction and enlargement of 110 kV switchyard
Engineering project for manufacturing, installation and set-up of cabinets and boards with relay protection for Substations 220 kV and 400 kV of The National Electric Company EAD
Reconstruction and enlargement of 110/20 kV Substation Kavarna
400/220/110 kV Substation Mizia – Reconstruction of 400 kV, 220 kV and 110 kV Switchyards
Construction of 110 kV Substation Mayak
Reconstruction and modernization of 110/15.75/6.3 kV Main Step-down Substation-2 (GPP-2), located in LUKOIL Neftohim Burgas AD
Substitution of 6 kV cables from First and Second Feeder to 6,3/0,4 kV Substation No. 220BH in LUKOIL Neftohim Burgas AD
Elaboration and realization of a Design for substitution of circuit breakers and disconnectors in 20 kV Indoor Switchgear at Oil-tank farm, located in LUKOIL Neftohim Burgas AD
Rehabilitation of the main transformer substations and construction of new mobile substations with adjacent distribution devices and connecting equipment, designed to increase the power supply from 6 kV to 20 kV – in Troyanovo-Sever and Troyanovo-3 mines
Changing the power supply scheme of 6/0.4 kV Substation No. 214, to direct power supply from 6 kV Indoor Switchgear of S/st GPP-2, first and second section
Supervisory Control and Data Acquisition (SCADA) System of eight railway stations, three Main Section Posts (MSP), and two Traction Substations (TS) TS Voluyak and TS Aldomirovtsi, situated along the railway lot Sofia – Kalotina-West
Enlargement of 110 kV Switchgear in 110/10/6.3 kV Substation Chelopech
Substitution of 20 kV distribution Switchgear in 20/6/0.4 kV Substation PS Maritsa at Neochim PLC
Reconstruction and modernization of 6 kV Switchgear in Substation No. 209
Reconstruction of external power supply for Substation 208 HV
Repair of transformers in Unit 1, Unit 2, Unit 3, and Unit 4 at Contour Global Maritsa East 3 TPP
Electrical and C&I works for construction of Installation for rough clearing of second-use scrap paper, at Glavinitsa Village, Pazardzhik
Maintenance of lighting installations in Contour Global Maritsa East 3TPP
Elaboration of detailed design for repair and rehabilitation of rectifier stations (RS). Rehabilitation of rectifier stations in the town of Stara Zagora, under the Project for Modernization and development of sustainable public transport in the town of S
Installation of Substation Automation System (SAS) for 220/110 kV Switchyard at Varna TPP
Reconstruction of substation 209A and shifting the power supply of operating facilities in LUKOIL Neftohim Burgas AD
Power supply of Distribution Substation in Neochim PLC, from 6 kV Main Distribution Substation in Maritsa-3 TPP, Dimitrovgrad
Repair of cable trestles, mast lighting, and Repair Shop panels in LUKOIL Neftohim Burgas AD
Design, supply of equipment for 6 kV Substation, dismantle of existing equipment, installation, tests and commissioning at Oil-tank farm Rosenets, located in LUKOIL Neftohim Burgas AD
Reconstruction of 110 kV relay protection in main step-down substation GPP-2 and in the opposite main step-down substations in LUKOIL Neftohim Burgas AD
Reconstruction and enlargement of 220 kV Switchyard at S/st Pleven-1 – turnkey project for design, construction, supply of equipment, electrical installation and commissioning
Substitution, delivery and commissioning of low-oil measuring transformers in 110 kV Indoor Switchgear of main step-down substation GPP-2 in LUKOIL Neftohim Burgas AD
Delivery of electrical equipment and execution of electrical works for erection of Karlovo Biomass Power Plant at Stroevo Village
Erection of pellet production plant: Supply of electrical equipment and construction activities
Design and construction of two 20/6,3 kV, 10 МVА Step-down Movable Substations
Delivery, installation and dismantle of 110 kV power circuit breakers and 110 kV power disconnectors
Installation of electrical heat-tracing to replace existing steam heat-tracing at LUKOIL Neftohim Burgas AD
Construction of 20 kV Overhead Line (OHL) from S/st Gledachevo to Reclaimer BRs112 in Troyanovo-1 Mine
Delivery, installation and commissioning of electrical equipment for compensation of reactive power of the heavy industrial mining equipment at Mini Maritsa-Iztok – Troyanovo-1 and Troyanovo-3 Mines
Recostruction, repair and modernization of traction substations Burgas and Karnobat
Еlectrical and C & I activities at a new ammonia production unit in existing fertilizer complex Duslo, located in Šaľa, Slovak Republic
500/220 kV Substation JVARI near the town of Zugdidi, Georgia
Delivery and installation of 2х1000kVA, 20/0,4 kV Concrete Transformer Station (CTS) for Pelletization Plant
Warehouse and production hull at Pelletization Plant BIOMASS DISTRIBUTION
Repair of transformers in Unit 1, Unit 2, Unit 3, and Unit 4 at CONTOURGLOBAL Maritsa East 3 TPP
400/220/110 kV Substation Maritsa-iztok – reconstruction of 110 kV Switchyard
Construction of new 110 kV Cable Line Kiparis, from S/st Zagorka to S/st Trayana
Repair of remote monitoring of Substation-2, at Port Terminal Rosenets
Reconstruction of feeder bays for Substation 214 from Substation GPP-2, including installation of differential protection with Intertrip function for power supply cables
Reconstruction of 110 kV Switchyard at 220/110/20/10.5 kV Substation Karnobat
Design, delivery and substitution of oil bushings with bushing insulators, in 110 kV Indoor Switchgear at Substation GPP-2
Substitution of equipment in 110 kV Switchyard in Aurubis Bulgaria Plant
Workshop 132. Substitution of two input circuit breakers and one section circuit breaker in transformer Substation TP-62
Engineering Project for elaboration of electrical and automation design for Montbard VBM120 production machine; completion of the activities set in the design
Enlargement of 110/6.3 kV Substation Biovet
Substitution of control cables for 110/6 kV power transformers and repair of cubicles of 6 kV Indoor Switchgear, at Main Step-down Substation GPP-2
Reconstruction of feeder bays for Substation 227 from Substation GPP-2, including installation of differential protection with Intertrip function, for power supply cables
Workshop 700. Rehabilitation of Distribution Substation РП-6
Repair of transformers in Unit 1, Unit 2, Unit 3, and Unit 4 of CONTOURGLOBAL Maritsa East 3 TPP
Electrical and construction works in Biovet Plant
Service maintenance and repair of frequency invertors
Installation and commissioning of electrical equipment in Substations Razgrad and Amylum
Workshops 620 and 630. Substitution of input circuit breakers, bus coupler breakers, and output circuit breakers in Distribution Switchgears of Transformer Stations ТП-55 and ТП-57
Delivery, installation and commissioning of MV vacuum contactors
Construction of 110/20 kV Provisional Substation Ihtiman
Reconstruction of 110 kV Switchyard in 110/20 kV Substation Chirpan
Repair of buildings owned by Sliven Network Operating Sub-District (NOSD)
Substitution of 29 frequency drives for electromotors of air coolers in Hydrocracking Complex
Reconstruction of input feeder bays and output feeder bays in 6 kV Switchgear in Main Step-down Substation GPP-4
Maintenance, reconstruction and construction of new street lighting installations in Stara Zagora Municipality
Modernization of 110 kV Switchyard in S/st Rosenets
Reconstruction of 110/20 kV Substation Ardino
Enlargement of 400 kV Switchyard in S/st Maritsa Iztok 3
Repair of facade, roof and premises in Control-administrative building and Indoor Switchgear at Substation Primorsko
Repair of cable ducts, foundations, and measuring bays in 110 kV Switchyard at Substation Dimitar Kanev
Repair of fence of 110 kV Switchyard in S/st Chernozem
Retrofit of 20 kV Switchgear in S/st Borisovgrad
Repair of facade and reconstruction of premises in Control-and-administrative Building and Indoor Switchgear at Substation Malko Tarnovo
Design, delivery, installation and commissioning of two frequency converters
Rehabilitation of 20 kV cable connections in S/st Dimitar Kanev
Retrofit of 10 kV Switchgear in S/st Trayana
Repair of 110 kV bays and construction of Substation Automation System in S/st Aytos
110/20 kV Substation Lauta – construction of new 110 kV feeder bay
Rehabilitation of 110 kV Switchyard (old part) in 400/220/110/31.5 kV S/st Plovdiv
Repair of MV bays in S/st Kabile
Substitution of control cabinets in 110kV Switchyard, S/st Besapara
Rehabilitation of 20 kV connections at S-st Arpezos
Reconstruction of 6 kV Switchgear in 110/6.3 kV Substation Poliesterni vlakna
Connection of an 80 MW Photovoltaic Power Plant
Overall reconstruction and modernization of Kazanlak Pumping Station
110/20kV Substation Melta – reconstruction of 110kV Switchyard and connection to industrial park
Modernization of 110/25kV Traction Substation Tvarditsa
110/20kV Main distribution substation at Industrial Park Balkan
Reconstruction of 20kV Indoor Switchgear in Substation Slaveykov
Yasna Polyana DWTP – reconstruction the Filtering and Pumping Station
SCADA, electrical panels, and commissioning of 33/110kV step-up substation at PV Park Greens
Modernization of 6kV Switchgear at industrial substation
Integration of frequency regulator at industrial compressor
Integration of frequency regulator at industrial compressor
Activity Areas
Electrical Substations and Overhead Lines (OHL)
Mining Industry
Power Plants under Operation
Manufacturing Industry
Oil & Gas Industry
Transport Infrastructure
Projects Map
News
The Schrack Technik Demonstration bus will stop at EL KONTROL
EL KONTROL was admitted to membership in Bulgarian Construction Chamber and entered in the Constructors Central Professional Register.
On 18.06.2008 EL KONTROL passed accreditation audit to the International Standard for Health and Safety OHSAS 18001:1999
Electrical erection of Stacker / Reclaimer as part of the coal and limestone handling system at Maritsa East 1 TPP
Substation 'Parvomai' - repair of 1-st section of the 110kV Switchyard
SIEMENS Demo - Truck Show
Supplementary Contract for Rehabilitation of Coal Handling Plant at Enel Maritsa East 3
On 10.06.2009 a specially equipped demonstration bus WAGO INFO-LINER was situated in front of EL KONTROL’s office.
New Order - Electrical Installation of Electric Precipitators (ESP) at Maritsa East 1 TPP
Price-list of Wago Kontakttechnik products
10 Years EL KONTROL
Presentation of Moeller products
Siemens Presentation: Demo-trucks Equiped with C&I Instrumentation and Low-voltage Equipment
EL KONTROL EOOD was certified according to the requirements of ISO 14001:2004 standard
Construction activity
EL KONTROL - Official Commercial Partner of ABB for Bulgaria
ABB Demo - Truck Show
Seminar of Siemens - TIA Portal Innovation Tour
Completion of the first stage of the construction works on Substation Helios 110/20kV
The official opening ceremony of the first stage of erection of substation “Helios” 110/20kV took place on June 26th 2011
SIEMENS Demo - Truck Show
Repair of concrete foundations of 400 kV Burgas Substation
Helios Substation
Еrection of a new Photovoltaic Park ‘Letnitsa’
Reconstruction of the 110/20kV Switchyard on Substation ‘Slaveykov’
INDUSTRIAL ELECTRONICS (IE) SERVICE-STATION
Обучение за експлоатация на честотни регулатори (en-GB)
Erection of Photovoltaic Park Letnitsa
Dushantsi Photovoltaic Park
Collaborative seminar for Industrial Automation with SIEMENS
ABB issued a Certificate by virtue of which EL KONTROL acquired a statute of authorized service partner of ABB
Modernization of 110/20/6 kV Substation Iztochna situated in Troyanovo-Sever
In December 2012 EL KONTROL finished works in 110/20 кV Substation Slaveykov, Burgas
Training Programs in El Kontrol
In July 2013 we finished implementation of the Reconstruction and enlargement of 110kV Switchyard in 110/20kV Substation “Aytos”
In December 2013 EL KONTROL commissioned Substations Mayak 110 kV and Kavarna 110/20 kV, located in northwest Bulgaria
In December 2013 EL KONTROL finished electrical installation works for reconstruction of Substation Mizia 400/220/110 kV. This Substation is the seventh construction site of 400 kV in succession for our Company
In January 2014 we finished implementation of a project at Mini Maritsa-East Enterprise
In February EL KONTROL started works under a new contract assigned by LUKOIL Neftohim Burgas AD
Delivery of electrical equipment and implementation of electrical works for erection of Karlovo Biomass power plant at Stroevo Village
DZZD EL KONTROL 2014 signed a contract for design and rehabilitation of rectifier stations under the Project for Modernization and development of sustainable public transport in Stara Zagora
Substitution of 20 kV distribution Switchgear in 20/6/0.4 kV Substation PS Maritsa at Neochim PLC - project was assigned to EL KONTROL by Neochim PLC
EL KONTROL started works for Reconstruction and modernization of 6 kV Switchgear in Substation No. 209 located on the territory of LUKOIL Neftohim Burgas AD
A common presentation by EL KONTROL and ABB Bulgaria was held on 20.11.2014 at the business premises of EL KONTROL in Stara Zagora. The event featured Specific characteristics of Emax2 air-insulated Circuit breakers, and Solutions and innovations of ABB r
EL KONTROL started implementation of electrical works for the Project modernization of Varna TPP
In March 2015 EL KONTROL started implementation of two new projects: Substation Pleven-1 in the town of Pleven, and Oil-tank farm (OTF) Rosenets on the territory of LUKOIL Neftohim Burgas AD
In July EL KONTROL started works under a new contract assigned by LUKOIL Neftohim Burgas AD – Reconstruction of 110 kV relay protection in main step-down substation GPP-2 and opposite main step-down substations in LUKOIL Neftohim Burgas AD
ABB expanded the license rights of EL KONTROL
EL KONTROL is Builder of the year for 2015 for Stara Zagora Region, Section: Construction sites of power infrastructure
EL KONTROL became Siemens Solution Partner
EL KONTROL announces internship positions
SIEMЕNS and EL KONTROL held a common technical seminar
EL KONTROL started a new project in Slovakia
SIRIUS – Industrial Controls
OPPORTUNITY FOR CARREER START IN EL KONTROL, 2017
EL KONTROL - the annual technical seminar commonly organized with SIEMENS Bulgaria
Career Days Exhibition at TU – Sofia
EL KONTROL successfully completed several major Projects
Weidmüller Demonstration Truck
Career start in EL KONTROL for engineers-to-be
Joint seminar with SIEMENS
EL KONTROL hosted the annual technical seminar with SIEMENS Bulgaria
ISO/IEC 27001:2017 Certification
EL KONTROL won recognition for commercial results
Implemented projects
The SIRIUS Demo-truck is heading to Stara Zagora
SIRIUS – Industrial Control
The Future of Automation
Reconstruction of 110 kV Switchyard at 400/220/110 kV Substation Maritsa-iztok – successfully completed
EL KONTROL has completed the first Sub-project for reconstruction of the street lighting in Stara Zagora Municipality
EL KONTROL has been recognized with the ABB Channel Partner Award
Builder of the Year for 2019
20 years EL KONTROL
Stara Zagora shines in Christmas decoration
The SIRIUS Demo-truck is visiting Stara Zagora
RITTAL Demo-Bus is visiting EL KONTROL
EL KONTROL has started Design and construction of two complete transformer stations to supply charging stations, design and construction of cable routes to charging stations
We completed rehabilitation of 110 kV Switchyard in 400/220/110/31.5 kV S/st Plovdiv
NOARK PRESENTATION
BUILDER OF THE YEAR AWARD
Christmas spirit in Stara Zagora
We completed the project for construction of charging stations for electric buses in Stara Zagora
Bavarian delegation visited EL КONTROL
EL KONTROL IS BUILDER OF THE YEAR 2023
Since 2023, we have become a SIEMENS Technology Partner for SIVACON S8 type-tested panels, and a VAR partner for NXAIR Switchgear
Next level up for students in Electrical Engineering
Round Table on "The Voice of the Bulgarian Electrical Industry"
Team building 25 years EL KONTROL
SIEMENS Technology Partner
A Certificate of Recognition by Siemens
Reception at the Consulate General of the Republic of Bulgaria in Munich
EL KONTROL invests 6 million BGN in a new production facility
Memorandum of long-term cooperation between EL kONTROL and SIEMENS Energy
Internship programs and Scholarship
Internships exhibitions 2025
Memorandum pf Understanding with Westinghouse Electric Company
Contact Us
BG
Search
Droptables
Manage Tables
Допълнително меню
Заявка за контрол
INSPECTION REQUEST
Sitemap
Кандидатствай за работа
Е-тест 1
Е-тест 2
test
Стажанти
РЕГИСТРАЦИЯ НА КАНДИДАТ ЗА РАБОТА В ЕЛ КОНТРОЛ
Кандидатствай за работа 2
СТАЖАНТСКА ПРОГРАМА: Производство на ел. табла
СТАЖАНТСКА ПРОГРАМА: Настройка и проверка на релейни защити
СТАЖАНТСКА ПРОГРАМА: Сервиз за промишлена електроника
El Kontrol
Използваме „бисквитки“, за да ви осигурим най-доброто изживяване на нашия уебсайт.
Приемам