Reconstruction of feeder bays for Substation 227 from Substation GPP-2, including installation of differential protection with Intertrip function, for power supply cables

Read more ...

Assignor:
LUKOIL Neftochim Burgas AD

Location:
Burgas

Assigned: 2018 / Completed: 2018

Workshops 620 and 630. Substitution of input circuit breakers, bus coupler breakers, and output circuit breakers in Distribution Switchgears of Transformer Stations ТП-55 and ТП-57

Read more ...

Assignor
Neochim AD

Location:
Dimitrovgrad

Assigned: 2018 / Completed: 2018