Erection, installation and commissioning of main equipment in Flue Gas Desulphurization Plant (FGD) and Gypsum Dewatering Plant at Maritsa East 2 TPP

Assignor:
АВВ Utility Automation GmbH. Germany

Location:
Kovachevo Village, Radnevo Municipality

Assigned: 2000 / Completed: 2001

Project description

EL KONTROL gained recognition by АВВ Utility Automation GmbH. which was the Contractor for Erection of Flue Gas Desulphurization Plant (FGD) for Units 7 and 8 in Maritsa East 2 TPP in year 2000. During the period 2000 - 2001 EL KONTROL completed electrical scope of the Project for erection of FGD by installing and commissioning 6 kV and 0,4 kV indoor switchgears, power transformers and power supply of the equipment.

Activities

  • Construction of cable trays for power and control cables;
  • Laying and connection of 0,4 kV and 6 kV power cables, installation of cable terminals;
  • Installation of 0,4 kV and 6 kV switchgears;
  • Installation of 6/0,4 kV transformers;
  • Control measurements and tests of cables and motors; issue of Inspection Certificates.

Other

Activities were completed promptly, and within the agreed deadlines. As a proof thereof, references have been given by АВВ Utility Automation GmbH. and Consortium INA/SHU.

 

 

Reference BG          Reference EN