Assignor:
АВВ Utility Automation GmbH. Germany
Location:
Kovachevo Village, Radnevo Municipality
Assigned: 2000 / Completed: 2001
Project description
EL KONTROL gained recognition by АВВ Utility Automation GmbH. which was the Contractor for Erection of Flue Gas Desulphurization Plant (FGD) for Units 7 and 8 in Maritsa East 2 TPP in year 2000. During the period 2000 - 2001 EL KONTROL completed electrical scope of the Project for erection of FGD by installing and commissioning 6 kV and 0,4 kV indoor switchgears, power transformers and power supply of the equipment.
Activities
- Construction of cable trays for power and control cables;
- Laying and connection of 0,4 kV and 6 kV power cables, installation of cable terminals;
- Installation of 0,4 kV and 6 kV switchgears;
- Installation of 6/0,4 kV transformers;
- Control measurements and tests of cables and motors; issue of Inspection Certificates.
Other
Activities were completed promptly, and within the agreed deadlines. As a proof thereof, references have been given by АВВ Utility Automation GmbH. and Consortium INA/SHU.