Rehabilitation of 220 kV Switchyard at Maritsa East 3 TPP - second stage: substitution of disconnectors and circuit breakers

Assignor:
The National Electric Company (NEC) EAD, High Voltage Network Enterprise, Sofia

Location:
Mednikarovo Village, Galabovo Municipality

Assigned: 2004 / Completed: 2004

Project description

After completion of the significant Project for reconstruction and enlargement of 400 kV Switchyard in Maritsa East 3 TPP, executed by EL KONTROL as a Main Contractor, the National Electric Company of Bulgaria through its High Voltage Network Enterprise proceeded to the next stage of the refurbishment of Maritsa East 3 TPP. Project concerns rehabilitation of 220 kV Switchyard, and its electrical scope was announced in a Public Procurement in March, 2004. EL KONTROL was selected as a Contractor and started implementation of the order for Rehabilitation of 220 kV Switchyard in Maritsa East 3 TPP - second stage: Substitution of disconnectors and circuit breakers in bays 10, 11, 12 (column 3) and bays 10, 11, 12 (column 0) - Primary and Secondary Commutation.

Activities

  • Dismantle of 220 kV equipment: current transformers, voltage transformers, disconnectors, surge arresters, support insulators, and circuit breakers;
  • Монтаж на съоръжения 220 кV: токови трансформатори, напреженови трансформатори, разединители, катодни отводители, подпорни изолатори, прекъсвачи;
  • Installation of 220 kV power equipment: current transformers, voltage transformers, disconnectors, surge arresters, support insulators, and circuit breakers;
  • Installation of busbar system;
  • Primary wiring of the equipment;
  • Manufacturing and installation of control panels on the bays;
  • Delivery and installation of control cables;
  • Control tests and commissioning of 220 kV Switchyard.

Other

The order was successfully completed, within the agreed time schedules. A Reference has been issued by NEC EAD, High Voltage Network Enterprise, Sofia.

 

 