Assignor:
National Electric Company EAD
Location:
Kazanlak
Assigned: 2008 / Completed: 2008
Project description
Project concerns construction of commercial measuring of the electrical energy consumed by six 20 kV cable transmission lines, which in practice modernizes and consolidates the existing measurement systems. The order includes full engineering of the measuring system - design, delivery and installation, in compliance with all the requirements of the Department for Measurement and Reporting of Electrical Energy and Energy Control (MREEEC), relevant to NEC. The electrical energy reading of the newly built system is done remotely through a GPRS modem by MREEEC's department.
Activities
- Design of project for adjustment and processing the existing measuring systems;
- Delivery of current transformers, voltage transformers, manufacturing of electro measuring panel;
- Installation of current transformers, voltage transformers and electro measuring panel;
- Control tests and commissioning of the installed equipment.