Supply and installtion of lighting system in Buffer pond area at Enel Maritsa East 3 Power Plant

Assignor:
ENEL Produzione S.p.A. - Branch Bulgaria

Location:
Mednikarovo Village, Galabovo Municipality

Assigned: 2009 / Completed: 2009

Project description

Order represents part of the Rehabilitation Project of Enel Maritsa East 3 Power Plant.

Activities

  • Supply of materials for installation of lighting system;
  • Design, manufacturing and installation of power distribution panels;
  • Erection of lighting system, laying and connection of power cables;
  • Commissioning works.