Substation Parvomai - repair of 2-nd section of the 110 kV Switchyard

Assignor:
Electricity System Operator EAD

Location:
Parvomay

Assigned: 2009 / Completed: 2009

Project description

Substitution of relay protection, control switchboards, relay panels and marshalling panels in the 2-nd section of the 110kV Switchyard.

Activities

Primary Commutation:

  • Substitution of relay protection, control switchboards, relay panels and marshalling panels in the 2-nd section of the 110kV Switchyard.

Secondary Commutation:

  • Manufacturing and installation of relay panels and control panels;
  • Set-up of relay protection;
  • Control tests of the installed equipment;
  • Laying and connection of control cables.