Electrical Installation of Electrostatic Precipitators (ESP) - units 1 and 2 in Maritsa East 1 TPP

Assignor:
Alstom Bulgaria EOOD

Location:
Galabovo

Assigned: 2009 / Completed: 2010

Project description

This order is part of the Project for construction of the new Maritsa East 1 TPP. EL KONTROL completed electrical installation of the ESP in Units 1 and 2, including installation of panels, delivery of materials and commissioning of the equipment.

Activities

  • Delivery of power, control and communication cables;
  • Laying and connection of power and control cables;
  • Installation of power supply panels for ESP;
  • Installation of cable trays and conduits;
  • Erection of lighting Installation;
  • Erection of earthing Installation;
  • Signposting;
  • Commissioning.

 

 