Assignor:
Alstom Bulgaria EOOD
Location:
Galabovo
Assigned: 2009 / Completed: 2010
Project description
This order is part of the Project for construction of the new Maritsa East 1 TPP. EL KONTROL completed electrical installation of the ESP in Units 1 and 2, including installation of panels, delivery of materials and commissioning of the equipment.
Activities
- Delivery of power, control and communication cables;
- Laying and connection of power and control cables;
- Installation of power supply panels for ESP;
- Installation of cable trays and conduits;
- Erection of lighting Installation;
- Erection of earthing Installation;
- Signposting;
- Commissioning.