Assignor:
Iberdrola Ingenieria y Construccion SA, Branch – Bulgaria; Client: EOLICA Bulgaria EAD
Location:
Suvorovo Municipality
Assigned: 2010 / Completed: 2011
Project description
Wind Farm Suvorovo is an industrial scale project developed by Eolika Bulgaria EAD. The Wind Farm is situated in Suvorovo Municipality, 20 km from Varna. It has total power capacity of 60 MW and includes 30 pcs. wind turbines, 20 kV underground connecting grid, 110/20 kV electrical Substation, 110 kV High-voltage line.
EL KONTROL participates in the construction of the 20/110 kV Substation Suvorovo, adjacent to the Wind Farm.
Activities
- Installation of Primary Commutation - 110/20 kV switchyard;
- Installation of Primary Commutation - 20 kV indoor switchgear;
- Supply and installation of cable supporting systems;
- Laying and connection of power and control cables;
- Installation of power supply switchboards, relay panels, rectifier, UPS;
- Supply and construction of grounding installation;
- Supply and construction of lightning protection system;
- Commissioning works.