Disassembly, design, installation and commissioning of electrical and C & I equipment in Coal Handling Plant at Enel Maritsa East 3 TPP

Assignor:
Enel Maritsa East 3 AD

Location:
Mednikarovo Village, Galabovo Municipality

Assigned: 2009 / Completed: 2011

Activities

  • Supply and installation of C & I equipment: level control sensors for hoppers, pressure sensors, velocity relay, limit switches, local control panels, and others.