Reconstruction of 110/6.3 kV Substation No. 2B

Assignor:
Mini Maritsa Iztok EAD

Location:
Radnevo

Assigned: 2010 / Completed: 2012

Activities

  • Substitution of existing 6.3 kV switchgears by delivery and installation of new ones, manufactured by ABB – Czech Republic;
  • Substitution of circuit breakers in 110 kV Switchyard;
  • Delivery and installation of control cabinets on the bay in 110 kV Switchyard;
  • Delivery and installation of relay panels, main signalization switchboard, AC / DC auxiliary panels;
  • Erection of lighting installation;
  • Erection of earthing installation;
  • Laying and connection of power and control cables;
  • Construction works in 110 kV Switchyard: excavations, concrete foundations, delivery and assembly of metal structures;
  • Construction works for enlargement of Control Room;
  • Construction of new water-supply and sewerage system;
  • Erection and putting into operation of a new Automatic Visualization and Control System for the equipment in 6kV and 110 kV Switchgears;
  • Commissioning works.

 

 