Construction and electrical works for erection of Photovoltaic Park Dushantsi

Assignor:
Efacec Engenharia S.A. Branch Bulgaria

Location:
Pirdop

Assigned: 2012 / Completed: 2012

Project description

Construction site is located in the town of Pirdop, Sofia district. The photovoltaic plant has a total area of 10 decares and a nominal power of 500 kW. Construction starts in April 2012.

Activities

Electrical scope:

  • Wiring and connection of PV modules and DC panels;
  • External connection of the PV Park to the 20 kV main grid;
  • Installation and connection of distribution switchboards;
  • Supply and installation of power cables and communication cables;
  • Installation of measuring devices;
  • Construction of earthing installation and lightning-protection installation;
  • Commissioning works.
  • Construction scope:
  • Construction of cable trenches;
  • Erection of fences;
  • Construction of concrete foundations for columns to support steel structure;
  • Erection of auxiliary concrete platforms.

 

 