Assignor:
Efacec Engenharia S.A. Branch Bulgaria
Location:
Pirdop
Assigned: 2012 / Completed: 2012
Project description
Construction site is located in the town of Pirdop, Sofia district. The photovoltaic plant has a total area of 10 decares and a nominal power of 500 kW. Construction starts in April 2012.
Activities
Electrical scope:
- Wiring and connection of PV modules and DC panels;
- External connection of the PV Park to the 20 kV main grid;
- Installation and connection of distribution switchboards;
- Supply and installation of power cables and communication cables;
- Installation of measuring devices;
- Construction of earthing installation and lightning-protection installation;
- Commissioning works.
- Construction scope:
- Construction of cable trenches;
- Erection of fences;
- Construction of concrete foundations for columns to support steel structure;
- Erection of auxiliary concrete platforms.