Assignor:
National Electric Company EAD
Location:
Burgas
Assigned: 2012 / Completed: 2012
Project description
110/20 kV Substation Slaveykov is situated in the town of Burgas. The Project for reconstruction of the 110 kV Switchyard envisages substitution of outdated equipment and reinforced concrete structures in the 110 kV Switchyard. Along with that, a new bay for 110 kV outgoing cable line is erected.
Activities
- Dismantle of power transformer and erection of 40/50 MVA transformer;
- Substitution of 110 kV busbar systems with solid tubular aluminum busbars;
- Substitution of reinforced concrete gates with steel-lattice ones;
- Substitution of all 110 kV equipment: circuit breakers, disconnectors, current and voltage transformers, surge arresters;
- Construction of a new bay for 110 kV outgoing cable line, towards S/st Centar;
- Construction of bays for measuring and surge arresters, to the two busbar systems;
- Construction of lighting installation in 110 kV Switchyard;
- Construction of roads and approaches;
- Construction of oil drainage system;
- Construction of water pipe and water shaft;
- Construction of fire walls between the power transformers.