Repair of concrete foundations in 400 kV Substation Burgas

Assignor:
Electricity System Operator EAD

Location:
Burgas

Assigned: 2011 / Completed: 2012

Project description

The Order for repair of concrete foundations for equipment in 110 kV Switchyard of 400 kV Substation Burgas is part of a major project for rehabilitation of the Substation.

Activities

  • Construction of concrete tables and foundations for the equipment in 110 kV Switchyard;
  • Construction of tubular grid of steel conduits