Engineering project for manufacturing, installation and set-up of cabinets and boards with relay protection for Substations 220 kV and 400 kV of The National Electric Company EAD

Assignor:
El-Test Ltd., Client: National Electric Company EAD

Location:
Sites in Southern and Northwestern Bulgaria

Assigned: 2007 / Completed: 2013

Project description

Order is placed by the Client - National Electric Company EAD (NEC). It presents part of an Investment Project for modernization and rehabilitation of the Bulgarian electricity transmission system.

The Project concerns substitution of existing relay protection with modern digital relay protection produced by SIEMENS, in all 220 kV and 400 kV switchgears in the country.

EL KONTROL performs substitution of relay protection equipped switchboards and power panels, in 220 kV and 400 kV Substations on Lot 1 and Lot 3 of NEC, located mainly in Southern Bulgaria:

220/110 kV Substation Aleko in Pazardzhik
400/110 kV Substation Bourgas in Burgas
220kV WPP Peshtera in Peshtera;
220kV WPP Teshel in Teshel Village, Devin Municipality
220/110 kV Substation Devin in Devin
220/110 kV Substation Karnobat in Karnobat
220/110 kV Substation Maritsa Iztok in Galabovo
400/220/110 kV Substation at Maritsa East 2 TPP in Kovachevo Village, Radnevo Municipality
400/220 kV Substation at Maritsa East 3 TPP in Mednikarovo Village, Radnevo Municipalityо
220/110 kV Substation Plovdiv-South in Plovdiv
220/110 kV Substation Stara Zagora in Stara Zagora
220/110 kV Substation Uzundzhovo in Uzundzhovo Village, Haskovo Municipality
220/110 kV Substation Chudomir in Kazanlak
220/110 kV Substation Tvardica in Tvarditsa
400/220/110 kV Substation Stolnik in Stolnik Village, Elein Pelin Municipality
220/110 kV Substation Boichinovci in Boychinovtsi
400 kV nodal Substation Vetren in Pazardzhik Municipality.

Activities

Subproject:
220/110 kV Substation Aleko
Location: Pazardzhik

  • Installation and commissioning of differential protection for 220 kV busbars and differential protection for Autotransformer 1 and Autotransformer 2;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

Subproject:
220 kV WPP Peshtera
Location: Peshtera

  • Installation and commissioning of back-up distance protection for 220 kV outgoing feeder;
  • Dismantle, laying and connection of control cables; br />
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • Control tests of the installed equipment.

Subproject:
220 kV WPP Teshel
Location: Teshel Village, Devin Municipality

  • Installation and commissioning of back-up distance protection for 220 kV outgoing feeder;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • Control tests of the installed equipment.

Subproject:
400/220/110 kV Substation at Maritsa East 2 TPP
Location: Kovachevo Village, Radnevo Municipality

  • Installation and commissioning of main distance-protection and longitudinal differential protection for 400 kV outgoing feeders;
  • Installation and commissioning of differential protection for 400 kV busbar connection;
  • Installation and commissioning of differential protection for 220 kV busbars;
  • Dismantle, laying and connection of control cables; br />
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

Subproject:
400/220/110 kV Substation at Maritsa East 3 TPP
Location: Kovachevo Village, Radnevo Municipality

  • Installation and commissioning of main distance-protection and longitudinal differential protection for 400kV outgoing feeders;
  • Installation and commissioning of differential protection for 400/220 kV Autotransformer;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

Subproject:
220/110 kV Substation Uzundzhovo
Location: Uzundzhovo Village, Haskovo Municipality

  • Installation and commissioning of main differential protection for 220/110kV AT1 and AT2;
  • Installation and commissioning of spare distance protection for 220 kV outgoing feeder;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • Erection of DIGSI network between the new relay protection and a local computer;
  • Control tests of the erected equipment.

Subproject:
220/110 kV Substation Chudomir
МLocation: Kazanlak

  • Installation and commissioning of main differential protection for Autotransformer 1;
  • Installation and commissioning of spare distance protection for 220 kV outgoing feeder;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

Subproject:
220/110 kV Substation Tvardica
Location: Tvarditsa

  • Location: Tvarditsa
  • Installation and commissioning of spare distance protection for 220 kV outgoing feeder;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

Subproject:
400/220/110 kV Substation Stolnik
Location: Stolnik Village, Elein Pelin Municipality

  • Installation and commissioning of differential protection for 220kV busbars; br />
  • Installation and commissioning of differential protection for 220/110kV Autotransformer;
  • Installation and commissioning of differential protection for 400/220kV Autotransformer;
  • Dismantle, laying and connection of control cables;
  • Installation of synchronization system between the clocks built-in the new digital relay protection and those in the existing relay protection;
  • DIGSI network between the new relay protection and a local computer;
  • Control tests of the installed equipment.

 

 

Reference