Project description
Project concerns substitution of existing outdated power cables, and partial repair of cable trestle in 6,3/0,4 kV Substation No. 220BH, located in LUKOIL Neftohim Burgas AD.
Activities
- Dismantle of existing 6 kV power cables;
- Repair of existing steel structure;
- Delivery, laying and connection of 6 kV power cables;
- Delivery and installation of 6 kV cable ends and joints;
- Commissioning works, phase determination, and testing of cables.