Substitution of 20 kV distribution Switchgear in 20/6/0.4 kV Substation PS Maritsa at Neochim PLC

Assignor:
Neochim PLC

Location:
Dimitrovgrad

Assigned: 2014 / Completed: 2014

Project description

20/6 kV Substation at Pump Station (PS) Maritsa is a part of the power system of Neochim PLC chemical plant in Dimitrovgrad providing electricity for the technological and production cycle of the plant. The 20 kV and the 6 kV Switchgears in the Substation are furnished with outdated equipment under years of exploitation causing frequent failures which disturb the fluency of production cycle in the plant. By reason of this a reconstruction and modernization of 20/6/0,4 kV SWGs has been planned.

EL KONTROL is assigned to elaborate a detailed design for construction of new 20 kV and 6 kV SWGs. Implementation of the works under the design is also within our scope, together with putting the installed equipment under operational use.

Activities

  • Elaboration of detailed design – Electrical and Construction part;
  • Delivery and installation of 20 kV equipment – current transformers, voltage transformers, disconnectors, circuit breakers, and surge arresters;
  • Delivery and installation of 20/0.4 kV power oil transformer;
  • Delivery, installation and connection of MV and LV cables;
  • Delivery and construction of cable trays;
  • Assembly of relay panels;
  • Assembly of control panels;
  • Assembly of AC/DC auxiliary panels;
  • Automation: Delivery and assembly of SCADA cabinet; integration to the existing SCADA;
  • Tests and commissioning of the installed equipment;
  • Training of operational personnel.

 

 

Reference BG          Reference EN