Assignor:
Ecobulhart EOOD (Investor)
Location:
Glavinitsa Village
Assigned: 2015 / Completed: 2015
Project description
This investment project concerns construction of an installation for processing of heavily-soiled paper and cardboard, separated from non-hazardous household waste. Construction takes place onto a detached terrain in Glavinitsa Village, Pazardzhik Municipality. Purpose of the installation is to get a commercial product of maximal cleanliness, and to achieve low consumption of energy and natural resources.
Activities
- Cable lines – supply, laying and connection of power and control cables in pipe ducts;
- Cable structures – supply and construction of cable ways;
- Construction of grounding installation;
- Commissioning works – tests of motors, commissioning of power-supply cable line;
- Delivery of protective means;
- MCC Panel (Main Control Panel)– design, manufacturing and installation;
- Software correction.