Assignor:
Efacec Engenharia S.A. – Branch Bulgaria
Location:
Ezerovo Village
Assigned: 2015 / Completed: 2015
Project description
Construction of SAS for 220/110 kV Switchyard at Varna TPP is set in the Project for general modernization of the Varna Thermal Power Plant.
Order includes manufacturing of protection and control panels, and supply of electrical materials for reconstruction of existing panels.
Activities
- Laying and connection of control cables;
- Installation of secondary commutation, tests and commissioning of SAS;
- Production and installation of 26 protection and control panels;
- Supply of electrical materials for reconstruction of existing panels.