Reconstruction of substation 209A and shifting the power supply of operating facilities in LUKOIL Neftohim Burgas AD

Assignor:
LUKOIL Neftohim Burgas AD

Location:
Burgas

Assigned: 2015 / Completed: 2015

Project description

Subject of this Project is modernization of S/st 209A by substitution of outdated and unreliable equipment, in LUKOIL Neftohim Burgas AD oil refinery. This reconstruction aims to ensure flawless and reliable power supply of the installations energized by S/st 209A.

Activities

  • Dismantle of existing equipment
  • Supply, pulling and connection of power cables
  • Construction activities: painting, plastering, anticorrosive protection, ground-coating
  • Supply and installation of steel structures – cable trestles
  • Manufacturing and installation of distribution boards.

 

 