Assignor:
LUKOIL Neftohim Burgas AD
Location:
Burgas
Assigned: 2015 / Completed: 2015
Project description
Project envisages repair of corroded cable trestles in Substations, located in LUKOIL Neftohim Burgas AD Refinery. Project also includes substitution of mast lighting, power supply lighting panels, and Repair Shop panels.
Activities
- Dismantle of steel structures and cables;
- Manufacturing and installation of metal supporting elements, hangers and stands for cable grids;
- Delivery and installation of cable grids and covers;
- Delivery, pulling and connection of low-voltage cables;
- Dismantle of floodlights, lighting fixtures, lighting power supply panels and distribution boards;
- Delivery and installation of explosion-proof lighting fixtures and junction boxes;
- Delivery and installation of floodlights for rehabilitation of the existing mast lighting;
- Manufacturing and installation of lighting power supply panels and distribution boards;
- Manufacturing of small steel structure, ground-coating and painting;
- Delivery and installation of grounding installation;
- Control tests and commissioning of low-voltage cables and electrical panels.