500/220 kV Substation JVARI near the town of Zugdidi, Georgia

Assignor:
EFACEC Contracting Central Europe GmbH

Location:
Zugdidi, Georgia

Assigned: 2015 / Completed: 2016

Project description

Construction of 500/220 kV Substation JVARI, Georgia started in March, 2015 from undeveloped terrain. The Substation is part of the significant Jvari-Khorga Project initiated by the Ministry of Energy of Georgia. As a trustworthy EPC partner of the main contractor EL KONTROL was invited to take part in this Project on several stages of the construction process.

Activities

  • Construction supervision;
  • Delivery of materials for Lighting and Grounding installation;
  • Cable delivery;
  • Delivery and equipping of electrical containers;
  • Assembly of electrical panels;
  • Electrical works for laying and connection of power and control cables in the Substation.

 

 

Certificate BG          Certificate EN