Assignor:
LUKOIL Neftochim Burgas AD
Location:
Burgas
Assigned: 2017 / Completed: 2017
Project description
Remote monitoring of S/st-2 serves to indicate the events at 6 kV and 20 kV switchgears. Repair of the monitoring includes dismantle of existing equipment, substitution of control cable, and substitution a signaling panel.
Activities
- Manufacturing, supply and installation of signaling panel;
- Dismantle of control cables and electrical equipment;
- Laying and connecting cables;
- Commissioning works - synchronization of signaling schemes.