Repair of remote monitoring of Substation-2, at Port Terminal Rosenets

Assignor:
LUKOIL Neftochim Burgas AD

Location:
Burgas

Assigned: 2017 / Completed: 2017

Project description

Remote monitoring of S/st-2 serves to indicate the events at 6 kV and 20 kV switchgears. Repair of the monitoring includes dismantle of existing equipment, substitution of control cable, and substitution a signaling panel.

Activities

  • Manufacturing, supply and installation of signaling panel;
  • Dismantle of control cables and electrical equipment;
  • Laying and connecting cables;
  • Commissioning works - synchronization of signaling schemes.

 

 

 Certificate BG          Certificate EN