Electrical and construction works in Biovet Plant

Assignor
Biovet AD

Location:
Peshtera

Assigned: 2018 / Completed: July, 2019

Subproject: Construction of MV electrical distribution network, MV Switchgears, LV Switchgears

Activities:

  • Delivery, laying and connection of power and control cables;
  • Delivery and installation of metal structures;
  • Busbar installation;
  • Installation of dry transformers;
  • Installation of MV Switchgear;
  • Installation of LV power distribution boards;
  • Delivery, laying and splicing of optical cable lines;
  • Delivery, programming and commissioning of C&I equipment;
  • Control tests on cable lines and start-up work.

Subproject: Modernization of Switchgear No.9 and Switchgear No.10 in 110/6 kV Substation Biovet

Activities:

  • Elaboration of Secondary commutation design;
  • Dismantle of existing equipment and installation of new: relays. current transformers, cable terminals, electric meters, digital relay protection, signaling lights;
  • Secondary commutation and function tests of Switchgear;
  • Elaboration of As-built documentation.

Subproject: Construction works in existing Substation Biovet

Activities

  • Dismantle of reinforced structures, cables, 110 kV equipment;
  • Formwork and concrete works; installation of steel structures and cable pipes.

Subproject: Construction of cable ways for 6 kV and 110 kV cables for connection between existing and new Substation Biovet

Activities

  • Excavation, formwork, concrete works; delivery and installation of steel hot-dipped galvanized pipes; delivery and installation of PVC pipes; making a pavement.