Rehabilitation of Units 3 and 4 in Maritsa East 3 TPP - Electrical works

Assignor:
Enel Produzione S.p.A - Branch Bulgaria

Location:
Mednikarovo Village, Galabovo Municipality

Assigned: 2007 / Completed: 2009

Project description

After implementation of electrical installation works for the rehabilitation of Units 2 and 1 in Maritsa East 3 TPP, EL KONTROL affirms its good reputation to Enel Produzione S.p.A - Branch Bulgaria, and in 2007 the two companies signed a new contract for execution of electrical works for Rehabilitation of Units 3 and 4 of the Power Plant.

Activities

  • Disassembly of existing equipment - transformers, switchgears, LV and MV cables, switchboards, cable trays, metal structures, bus-bar system;
  • Installation of new equipment - laying and connection of LV and MV cables, switchboards, circuit breakers, cable trays and pipes, grounding system;
  • Rehabilitation of MV equipment;
  • Disassembly and installation of 220 kV equipment;
  • Construction and rehabilitation of cable racks;
  • Installation of lighting and power socket system;
  • Manufacturing, supply and installation of switchboards: power distribution switchboards, DC panels, local control switchboards;
  • Control tests and commissioning of the installed electrical equipment.

 

 