Construction of 110/20 kV Provisional Substation Ihtiman

Assignor
Electricity System Operator (ESO EAD)

Location:
Ihtiman

Assigned: 2018 / Completed: 2018

For implementation of this project EL KONTROL participates in the Consortium DZZD Ihtiman.

Project includes design, supply, installation and commissioning of 110/20 kV provisional Substation to power supply the electrical distribution network of Ihtiman Municipality.

Activities

EL KONTROL performs the following activities:

  • Delivery and installation of el. house, construction of electrical installation, lighting installation, air-conditioning installation;
  • Delivery and installation of Siemens Switchgear;
  • Delivery and installation of battery and rectifier;
  • Delivery and installation of Auxiliary Transformer;
  • Manufacturing and installation of electrical switchboards.