Design, delivery and substitution of oil bushings with bushing insulators, in 110 kV Indoor Switchgear at Substation GPP-2

Assignor:
LUKOIL Neftohim Burgas AD

Location:
Burgas

Assigned: 2017 / Completed: 2018

Project description

Construction site is located in LUKOIL Neftohim Burgas Refinery.

Order concerns design, delivery, installation and commissioning of 30 pcs. bushing insulators in 110 kV Indoor Switchgear at Substation GPP-2.

Activities

Design Stage

  • Design of primary commutation for 30 pcs. bushing insulators.

Installation and commissioning Stage

  • Dismantle of existing oil bushings;
  • Dismantle of existing mounting bases for bushings;
  • Delivery of 30 pcs. 110 kV bushing insulators and materials for their installation and wiring;
  • Production and installation of mounting bases;
  • Installation of wall bushings and connection to existing equipment in the 110 kV Indoor Switchgear at Substation GPP-2;
  • Substitution of existing strain clamps with new compression strain clamps;
  • Commissioning works.

 

 