Assignor:
Neochim AD
Location:
Dimitrovgrad
Assigned: 2018 / Completed: 2018
Construction takes place at Neochim AD chemical plant, Dimitrovgrad.
It concerns substitution of all start-up equipment in the LV compartment of nine 6 kV motor feeder bays, and in two 6 kV input feeder bays.
Activities:
- Dismantle, supply and installation of new panels according to the Assignor’s specification: Lighting panel, Emergency Lighting Panel, Auxiliary DC Panel;
- Substitution of operating and emergency lighting in Distribution Switchgear of Substation РП-6
- Installation of control and power cables.