Assignor:
LUKOIL Neftochim Burgas AD
Location:
Burgas
Assigned: 2018 / Completed: 2018
Project description
Construction works take place at Main Step-down Substation GPP-2 in LUKOIL Neftochim Burgas AD Refinery.
Activities
Scope of works:
- Dismantle of concrete covers of cable ditches
- Dismantle of cables;
- Installation and fixation of control cables onto steel structure; connection of power and control cables to power transformers;
- Substitution of end switches, electromagnetic locks, and disconnector signaling devices in 6 kV cubicles;
- Repair of 6 kV disconnectors;
- Substitution of mesh fences for 6 kV cubicles’ doors with thick metal sheets;
- Construction and repair works;
- Commissioning works.