Sector
Oil & Gas
Location
Burgas Municipality, Region of Burgas
Date of assignment: May, 2024 / Completion date: March, 2025
Project concerns supply, installation, and commissioning of 6kV NXAIR air-insulated Switchgear.
The facility replaces an obsolate Switchgear, and provides reliable power supply to 6kV consumers in a substation at an oil refinery.
The NXAIR Switchgear has been accomplished by EL KONTROL under license from Siemens.
Equipped with 6kV withdrawable vacuum circuit breakers, digital relay protection, metering transformers, fixed earthing, terminal blocks, and cables for operating circuits.
The Switchgear was delivered to the customer’s site, installed, tested and put into operation.