Substitution of 6 kV cables from First and Second Feeder to 6,3/0,4 kV Substation No. 220BH in LUKOIL Neftohim Burgas AD
Assignor:
LUKOIL Neftohim Burgas AD
Location:
Burgas
Assigned: 2013 / Completed: 2013
Assignor:
LUKOIL Neftohim Burgas AD
Location:
Burgas
Assigned: 2013 / Completed: 2013
Assignor:
LUKOIL Neftohim Burgas AD
Location:
Burgas
Assigned: 2013 / Completed: 2013
Assignor:
Efacec Engenharia e Sistemas S.A.
Location:
Hadzhi Dimitar Village
Assigned: 2012 / Completed: 2013
Assignor:
Electricity System Operator EAD
Location:
Ruptsi Village
Assigned: 2012 / Completed: 2013
Assignor:
ENEL Produzione S.p.A. - Branch Bulgaria
Location:
Mednikarovo Village, Galabovo Municipality
Assigned: 2009 / Completed: 2009